01 ZIL Mixed-use Development .jpg
01 ZIL Mixed-use Development .jpg

press to zoom
01 ZIL Mixed-use Development .jpg
01 ZIL Mixed-use Development .jpg

press to zoom
1/1

 URBAN DESIGN      HOSPITALITY      RESIDENTIAL      COMMERCIAL      EDUCATION      SPORTS      INTERIORS    DESIGN MANAGEMENT

 

 

 

 

 

 

 

 

ФОТОМОНТАЖ 2.jpg
ФОТОМОНТАЖ 2.jpg

press to zoom
ФОТОМОНТАЖ 2.jpg
ФОТОМОНТАЖ 2.jpg

press to zoom
1/1
1/1
YH1
YH1

press to zoom
YH1
YH1

press to zoom
1/1
01 Torpedo Mixed-use Development .jpg
01 Torpedo Mixed-use Development .jpg

press to zoom
01 Torpedo Mixed-use Development .jpg
01 Torpedo Mixed-use Development .jpg

press to zoom
1/1
BOH5 copy 2
BOH5 copy 2

press to zoom
1 U2 Mixed-Use Development copy.jpg
1 U2 Mixed-Use Development copy.jpg

press to zoom
BOH5 copy 2
BOH5 copy 2

press to zoom
1/2
21_03_red (2)_edited
21_03_red (2)_edited

press to zoom
21_03_red (2)_edited
21_03_red (2)_edited

press to zoom
1/1
TBH1.jpg
TBH1.jpg

press to zoom
02 Beach House Resort.jpg
02 Beach House Resort.jpg

press to zoom
TBH1.jpg
TBH1.jpg

press to zoom
1/2
R4
R4

press to zoom
3
3

press to zoom
BW1
BW1

press to zoom
R4
R4

press to zoom
1/7
01 Chivashia Inovative housing.jpg
01 Chivashia Inovative housing.jpg

press to zoom
01 Chivashia Inovative housing.jpg
01 Chivashia Inovative housing.jpg

press to zoom
1/1
01 Salans Bruxels.jpg
01 Salans Bruxels.jpg

press to zoom
01 Salans Bruxels.jpg
01 Salans Bruxels.jpg

press to zoom
1/1
nestle
nestle

press to zoom
Nestle-01
Nestle-01

press to zoom
Nestle
Nestle

press to zoom
nestle
nestle

press to zoom
1/5
1/3
ARTHUR COX HQ 
 
 
Bank facilities and Class A offices 
 
 
PROJECT TYPE - Commercial
CLIENT – Arthur Cox Bank HQ
LOCATION - Dublin
SERVICES - Feasibility Study and Concept Stage
SIZE - 22,000 m² / 236,800 ft²
VALUE - €43.2M 
STATUS - on hold
DESIGN: G. Zarian whilst at  STW

 

 

 

 

 

This Class A office building was to replace the existing 70s building situated in Dublin City Centre. The building had to be designed around the existing church and therefore, all care was taken to preserve and emphasize its architectural presence. The proposed fully glazed curtain walling facade of the building as a calm background highlights the church building and as a result, both buildings are winning from this juxtaposition. The three stepped modular blocks and two atria provide offices with ample natural light and unobstructed visual links to St. Stephen's Green. The ground floor premises including the atria are arranged as an open plan interconnected spaces providing a rich sequence of experiences.