01 ZIL Mixed-use Development .jpg
01 ZIL Mixed-use Development .jpg

01 ZIL Mixed-use Development .jpg
01 ZIL Mixed-use Development .jpg

1/1

 URBAN DESIGN      HOSPITALITY      RESIDENTIAL      COMMERCIAL      EDUCATION      SPORTS      INTERIORS    DESIGN MANAGEMENT

 

 

 

 

 

 

 

 

ФОТОМОНТАЖ 2.jpg
ФОТОМОНТАЖ 2.jpg

ФОТОМОНТАЖ 2.jpg
ФОТОМОНТАЖ 2.jpg

1/1
1/1
YH1
YH1

YH1
YH1

1/1
01 Torpedo Mixed-use Development .jpg
01 Torpedo Mixed-use Development .jpg

01 Torpedo Mixed-use Development .jpg
01 Torpedo Mixed-use Development .jpg

1/1
BOH5 copy 2
BOH5 copy 2

1 U2 Mixed-Use Development copy.jpg
1 U2 Mixed-Use Development copy.jpg

BOH5 copy 2
BOH5 copy 2

1/2
21_03_red (2)_edited
21_03_red (2)_edited

21_03_red (2)_edited
21_03_red (2)_edited

1/1
TBH1.jpg
TBH1.jpg

02 Beach House Resort.jpg
02 Beach House Resort.jpg

TBH1.jpg
TBH1.jpg

1/2
R4
R4

3
3

BW1
BW1

R4
R4

1/7
01 Chivashia Inovative housing.jpg
01 Chivashia Inovative housing.jpg

01 Chivashia Inovative housing.jpg
01 Chivashia Inovative housing.jpg

1/1
01 Salans Bruxels.jpg
01 Salans Bruxels.jpg

01 Salans Bruxels.jpg
01 Salans Bruxels.jpg

1/1
nestle
nestle

Nestle-01
Nestle-01

Nestle
Nestle

nestle
nestle

1/5
O'CONNELL BRIDGE HOUSE
 
Full refurbishment of 11 storey office building 

 

PROJECT TYPE - commercial, workplace, office fit-out
CLIENT - Nestle
LOCATION - Dublin
SERVICES - All design stages
SIZE - 7,095 m² / 75,546 ft²
VALUE - IR £8.5 M 
STATUS - Built

 

 

 

 

 

 

 

 

1/3
This project involved a full refurbishment of the existing office building, providing a modern class A office space in this pivotal location in Dublin city centre. As the ceiling height was restricted, the four-pipe fan coil unit system was installed along the inner perimeter wall to allow for maximum height. All engineering systems including air-conditioning, cooling, and air handling equipment were replaced with the new ones. The lift lobbies and toilet cores were upgraded to the highest standards. The planning permission restricted the interference with the existing building facade, therefore, we only replaced the curtain walling and cleaned the stonework.